Tech Bulletins
Service Bulletin #14 Model 54E Return Spring - June 2019
RE: 54E Stapler fires weak and won’t set staple. Return spring Replacement.
Service Bulletin #13 Model 15FS Drive Blade Assembly - August 2018
RE: Important information about the Model 15FS drive blade assembly.
Service Bulletin #12 50P Series Top Load Channel - October 2017
RE: This Technical Bulletin contains important information on our new revised top-load channel for the 50P series nailers.
Service Bulletin #11 2000F Piston, Driveblade, Gate Plate revision - May 2017
RE: This Technical Bulletin goes over the 2000F Piston, Drive Blade, and Gate Plate revisions.
Service Bulletin #10 Flex Foot Adjustable Lever (Trigger-Pull Products) - September 2016
RE: This Technical Bulletin explains how the Adjustment Lever is used to position the Flex Foot on F-Series Trigger-Pull Nailers .
Service Bulletin #9 Model 2000 Revised Piston/Drive Blade & Gate Plate - August 2016
RE: This technical bulletin contains important information on our revised drive blade and gate plate for the Model 2000 nailer.
Service Bulletin #8 Model 50P New Revised Steel Foot - July 2016
RE: This technical bulletin contains important information on our new, revised 50P foot, gate, and gate plate.
Service Bulletin #7 Seal Identification Chart - July 2014
RE: A one page chart showing all seals to actual scale used in the pneumatic mallet-actuated Powernailer® seal kit (part #: 09-2003058A) and the tune-up kits (for accuracy, use “actual size” printer settings).
Service Bulletin #6 PowerJack Ratchet Spring Installation - May 2013
RE: This technical bulletin shows the correct way to install a ratchet spring with the right amount of tension.
Service Bulletin #5 Driving Blade Reference - August 2012
RE: Chart of driving blades for all current Powernail Powernailer® models.
Service Bulletin #4 Pneumatic Tool Oiling - July 2012
RE: Review or performance issues if nailer is not oiled approximately once an hour.
Service Bulletin #3 PowerPalm Oiling - May 2012
RE: Review or performance issues if nailer is not oiled approximately once an hour.
Service Bulletin #2 Air Fittings - April 2012
RE: Air fittings and common 3/8″ or 1/4″ adapters available.
Service Bulletin #1 Front Bearings - March 2012
RE: Front bearings, urethane covers, larger bearing available, installation of pre-finished versus unfinished flooring.