FINAL INSPECTION, LEAKS AND FUNCTION - Step by Step
Back to Repair Index
    


Use the PLAY, Pause and Stop Controls Above
or click here for the Video and Sound.


 •  Check that all screws are tight

 • Set air pressure to 90 psi

 


 •  Connect air, pull safety trigger point away,

 • then cycle nailer -- at this time there should be no air leaks.

 • Dry cycle nailer to remove excess lubrication within the nailer.


 • Load nailer with Powernail Powercleat nails and test nailer on hardwood flooring

Back to Repair Index

Previous Next
<= Final Upper Nailer Reassembly Final Inspection-Proper Placement of Nail =>