FINAL INSPECTION, LEAKS AND FUNCTION - Step by Step
Back to Repair Index
|
|
![]() |
![]() |
| • Check that all screws are tight | |
![]() |
• Set air pressure to 90 psi |
|
|
|
![]() |
![]() |
| • Connect air, pull safety trigger point away, | |
![]() |
![]() |
| • then cycle nailer -- at this time there should be no air leaks. | |
![]() |
![]() |
|
• Dry cycle nailer to remove excess lubrication within the nailer. |
|
![]() |
![]() |
| • Load nailer with Powernail Powercleat nails and test nailer on hardwood flooring | |